Productivity Calculator

Productivity Calculator

Want to see how using the Street Works Street Trencher for your utility road work is the fastest and most cost-effective method for digging through asphalt and steel-reinforced road surfaces? Just enter your project values below to see how quickly and efficiently our equipment can trench, pulverize, and backfill in just one pass.

Linear Feet
Trench Width (inches) "
Trench Depth (inches) "
Cutting Time IN HOURS
Material Removed In Tons
Dump Truck Loads To Remove Material

The values above are based on the average cutting production of the street trencher in a typical 2”- 4” of asphalt / 6”-8” concrete roadway. Material removed based on an average of 75 pounds of material per cubic foot dug. Dump truck loads based on average capacity of 15 tons truck per load.